First Power-On
A newly assembled 12 V controller is ready for its first bench test. The expected idle current is 65–95 mA. Inspect it without power, resolve anything unsafe, then establish the documented idle baseline under a deliberate current limit before connecting a debugger.
Requirements
Input 12 V ±0.6 VExpected idle 65–95 mABaseline-gate limit 150 mA+5V range 4.75–5.25 V+3V3 range 3.20–3.40 V
- 01Pre-power checks
- 02Inspect + repair
- 03Controlled power
- 04Verify baseline
DMM / POWER OFFSettled resistance to GND
Protected 12 V input after the fuse and reverse-polarity stage.
Select a measurement target, then measure to inspect the result.
Evidence notebook 0 saved
No evidence saved yet. Measure, inspect the result, then save useful observations.
Technical references
The current limit and readings belong to this prepared board. All checks in this mission use the on-screen instruments.